I-85 SEWER CLOSER THAN EVER

A vote last night by the board of the Joint Regional Sewer Authority is seen as a sign that piped sewer to I-85 in Oconee is closer than ever. The sewer board voted to enter into a contract with an engineering firm for a final design of the I-85 corridor expansion project. Davis and Floyd are to receive up to $255 thousand for the final design work.
February 4, 2020 Dick Mangrum