Roof Project underway at Seneca City Hall

Work is underway at Seneca City Hall to repair the roof.  Visitors to City Hall are advised to use caution around the building.  On Thursday, two spaces in the front parking lot will be blocked off to traffic.  On Friday, all of the front parking lot will be blocked off along with the drive on the side of the building next to the Old Town Hall.  On Saturday, all of the back parking lot will be blocked, including the Seneca Light and Water drive-thru window.  The drive-thru will be reopened on Sunday, July 28.  The City of Seneca apologizes for any inconvenience this roof repair work may cause.